King Abdul Aziz International Airport Saudi

King Abdul Aziz International Airport Saudi

King Abdul Aziz International Airport in Jeddah, Saudi Arabia, began…...

King Abdul Aziz International Airport in Jeddah, Saudi Arabia, began a new project in 2000 to increase the comfort, satisfaction and service levels provided to travellers in the airport, as well as enabling the airport to be able to cope with increased traffic.
The existing southern terminal needs to be able to serve about 21 million passengers a year over the next 20 years to meet growing demand at the airport. Prince Sultan noted that the improvement project would use the highest technology available to bring the airport utilities in line with the latest developments.
King Abdul Aziz Airport is the gateway to Saudi Arabia for a large number of pilgrims. The airport is close to the cities of Mecca and Medina, two of the holiest sites in Islam. During the 2005 Hajj (pilgrimage) season it received 3.5 million travellers and around two million pilgrims.
"King Abdul Aziz Airport is the gateway to Saudi Arabia for a large number of pilgrims."
The airport has to provide the facilities required for the service of pilgrims and those who visit the country to perform Umrah. The north terminal is used by the various international airlines that fly into the airport. The south terminal is reserved for Saudi Arabian Airlines flights only. The airport as a whole serves around 12 million passengers a year.
THE HAJJ TERMINAL
The Hajj terminal, which was built when the airport was first opened in 1981, is used only during the Hajj season, and it caters to Makkah (Mecca) bound passengers only. The terminal is the fourth largest in the world with a floor space of five million square feet (465,000m²) and is positioned on a site of over 100 acres (405,000m²) of ground area being well known for its signature tent-shaped roof.
The Hajj terminal roof is not a tent, but consists of a white PTFE-coated fibreglass membrane (one of the largest structures of this kind type in the world). Each of the semi-conical roofs were constructed from 4.6m² of the fibre-glass material, which because of harsh sandstorms in the area is self-cleaning and has a life expectancy of 30 to 50 years.
The Hajj terminal consists of two rectangular, two-storey, air-conditioned buildings (these contain airport services such as: immigration, customs, baggage reclaim areas, check-in counters) and also rectangular platforms, which are covered by the 'tent form' rooves. The building has a central spine, providing an entry road for buses and taxis.
The 210 rooves are supported by a tensioned support cable suspended from a grid of 144 epoxy-coated 50m steel columns, which taper from 2.6m diameter at the base to 1m at the top. The base of the fabric is suspended about 20m above the floor. In addition there are thirty-two radial steel cables rising a further 12m attached to a 4m-diameter tension ring, allowing this large roof structure.
The material of the roofs was designed as a translucent material but it is made for low transmission of heat (only 7% of light is allowed through) keeping the temperature down to around 80°F when the exterior temperature is over 120°F.
The terminal also has its own mosque, and can accommodate over 80,000 travellers at one time. The terminal is used by a variety of airline charters during the Hajj season, the only airline not using its facilities is Saudi Arabian Airlines since it only uses the South Terminal at the airport.
Geiger Berger Associates, Schlaich, Bergermann und Partner sbp GmbH and Skidmore, Owings & Merrill were the structural engineers for the project. Hochtief AG was the general contractor. Nippon Kokan was responsible for the steel work and Birdair Inc provided the membrane material.
HAJJ TERMINAL SOUND SYSTEM
The Hajj terminal sound system was upgraded in mid-2007 with the system being designed by Citytec Mediatronics-ME and including the Renkus-Heinz Iconyx IC24 column speaker. Phase I of the sound system upgrade was completed prior to the 2007 Hajj and phase II was finished shortly after.
"The King Abdul Aziz Airport expansion will include gold-coloured crescent-shaped roofs, and internal gardens and walkways."
The sound system was designed to conduct important voice announcements over the background noise generated by up to 80,000 people in the Hajj terminal at any one time. The system also uses an automatic announcement system from Sittig Industrial Electronics / Germany to make announcements in multiple languages.
The audio distribution for the system uses a Klotz Digital Vadis triple eight framework (real-time system), which can play simultaneously eight different announcements to any number of zones around the terminal.
THE ROYAL TERMINAL
The Royal Terminal was completed in 2003 and is a completely self-contained terminal for the exclusive use of the King of Saudi Arabia, other members of the Royal family, and their personal guests, including visiting Heads of State.
The facility and its large parade grounds are designed to handle state functions, ceremonies and international events. The building is divided into three zones. A reception hall characterised by a high tent-shaped ceiling, clad on the exterior with a copper roof, occupies the centre zone. It separates the administration, press and VIP women's areas to the north from the Royal suite, lounges and VIP men's areas to the south.
KING ABDUL AZIZ AIRPORT EXPANSION PLANS
The current project includes construction of two new terminals, one for international and one for domestic passengers, and extension of the existing Southern terminal, for international and VIP use, with passageways connecting the terminals.
In addition, there will be a new concourse with 25 gates, three connector buildings and an extensive upgrade of landside and airside infrastructure facilities. A large consideration will be the construction of a new high-speed rail link from Jeddah to the airport as well as accommodating the A380 superjumbo.
A new two-storey car park will accommodate 5,700 cars, and 25 passenger bridges will connect departure and arrival lounges directly with aircraft. Distinguishing features of the architectural style will be gold-coloured crescent-shaped roofs and internal gardens and walkways.
By the end of the project, the airport's annual passenger capacity is expected to have increased from 13 million to 21 million. As Abdullah Ruhaimy, head of the Presidency of Civil Aviation (PCA), has said, "The project is designed to accommodate the new generation of large aircraft." Emirates Airlines alone has 45 A380s on order for delivery between 2006 and 2008.
The project is now progressing well as the authorities are keen for King Abdul Aziz to be a serious competitor for Dubai International as the region's main hub for cargo and passengers. The southern terminal extension was completed in mid 2005 and will just require a small amount of work to integrate it with the new terminals when they are completed.
"The expansion is scheduled for completion by late 2010."
BACKGROUND AND FUNDING
King Abdul Aziz International Airport, which was first opened in 1981, has been under expansion since the project was announced in September 2000.
Due to designs and planning taking longer than usual the main expansion project construction activities were not started properly until 2003. Funding was no problem, with the expansion programme being awarded SAR4bn ($1bn) in 2000.
The Saudi Civil Aviation Authority signed a $1.5 billion agreement with Bechtel-Saudi Arabia and Dar Al-Riyadh for the expansion of the King Abdul Aziz International Airport in Jeddah in 2003. Work started in the second quarter of 2004 and the expansion is scheduled for completion by the final quarter of 2010.
DESIGN SERVICES CONTRACT
A design services contract was signed by the Netherlands Airport Consultants (NACO), a Dutch consultant company specialising in airports, in 2001.
NACO carried out designs for the complete renovation of the existing station hall, two new passenger terminals for domestic and international arrivals, and a docking pier with 32 passenger gangways linking the terminals with aircraft. The designs were completed in February 2002. The contract also included some ground water studies and financial appraisal.
RUNWAYS
The airport has three runways, in addition to taxiways parallel to the runways. A distance of 2,146m separates the two parallel runways to facilitate simultaneous take-off and landing operations by aircraft as large as the A380. Runways include: 16L/34R (12,106ft, 3,690m), 16C/34C (10,825ft 3,299m) and 16R/34L (12,467ft 3,800m).
A road for Ground Support Equipment (GSE) runs along the western side of the central terminal and is designed to allow access to aircraft and to facilitate the movement of baggage vehicles. Studies are underway to determine if the specification of the runways is sufficient for the extra weight of the A380.

Related Projects

new title

Saudi plans16 power projects in eastern area

Saudi Arabia intends to carry out 16 key power projects in its eastern province of Ihsa over the next three years to meet a steady…

Companies in Saudi Arabia,Saudi Arabia Companies,Products,Advertising in Saudi Arabia,Events Saudi Arabia, Projects in Saudi Arabia,Saudi Arabia Tenders,Companies in Riyad,Saudi Arabia companies,Infosaudi.sa